STUDY OF HYDROGEOLOGICAL CHARACTERISTICS FOR CONSIDERATION OF MINE DEWATERING PLAN AT CIURUG VEIN PT. ANEKA TAMBANG, TBK UBPE PONGKOR
Underground mine operation at Ciurug Vein is operated by Pongkor Gold Mine Business Units belongs to PT. Aneka Tambang, Tbk. is an underground mine located in hilly area. Ciurug gold vein mining starting from the elevation of 700 masl and at elevation 445 masl get problems in the presence of groundw...
Saved in:
Main Author: | DWIKA PARAMANANDA (NIM : 12113017), I.K. |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27949 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CHARACTERIZATION STUDY OF HYDROGEOLOGY FOR CONSIDERATION OF MINE DEWATERING DESIGN IN CIGUHA AND GUDANG HANDAK VEIN, PT ANEKA TAMBANG TBK. UBPE PONGKOR
by: Wirya Alamsyah, Prayoga -
EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
by: RADINA WIBISONO (NIM : 12113084), PANDU -
SILL PILLAR STABILITY ANALYSIS BASED ON JOINT MEASURING IN SOUTH CIURUG UNDERGROUND MINE, PT ANEKA TAMBANG Tbk. UBPE PONGKOR
by: OKTA TRIANSYAH (NIM : 12105018); Pembimbing : Dr. Ir. Budi Sulistianto, MT., ALHADI -
MEASURENTMENT OF RESISTANCE AT AIRWAYS AND VENTILATION SYSTEM NETWORK ANALYSIS IN MINE CIURUG UBPE PONGKOR, PT. ANEKA TAMBANG Tbk. USING SIMULATOR KAZEMARU
by: AKHMAD YUNADI (NIM 12101038); Pembimbing: Dr. Nuhindro Priagung Widodo, ST.,MT., NINO -
STABILITY EVALUATION AND DESIGN SUPPORT OF TUNNEL ACCESS RAMP UP 4 CENTRAL CIURUG L450 PT. ANEKA TAMBANG TBK UBPE PONGKOR.
by: Yatjong, Isramyano