#TITLE_ALTERNATIVE#

<p align="justify">Based on Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) of PT PLN 2017 – 2026, there is an increase in total peak load that connected to the two of main electrical system in Sumatra (Northern and Southern Electrical System) become 5946 MW at the end of 2016. Th...

Full description

Saved in:
Bibliographic Details
Main Author: ADJIE KURNIYA - NIM. 18014041 , MAHARDHIKA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/28710
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia