<p align="justify">Based on Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) of PT PLN 2017 – 2026, there is an increase in total peak load that connected to the two of main electrical system in Sumatra (Northern and Southern Electrical System) become 5946 MW at the end of 2016. Th...

Full description

Saved in:
Bibliographic Details
Main Author: ADJIE KURNIYA - NIM. 18014041 , MAHARDHIKA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/28710
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:28710
spelling id-itb.:287102018-06-06T10:14:36Z#TITLE_ALTERNATIVE# ADJIE KURNIYA - NIM. 18014041 , MAHARDHIKA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/28710 <p align="justify">Based on Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) of PT PLN 2017 – 2026, there is an increase in total peak load that connected to the two of main electrical system in Sumatra (Northern and Southern Electrical System) become 5946 MW at the end of 2016. Thus, the power system’s reliability is necessary because the failure in overcoming any disruptions that can occur anytime, will result in stalled of electrical energy supply to serve load demand across the island. One of the possible disturbances is the disturbance to small signal stability. <br /> <br /> The excitation control system of generator’s inability in facing small signal stability problems will cause the rotor’s oscillation at low frequencies continuously. Generally, the use of Automatic Voltage Regulator (AVR) raise the rotor’s synchronization torque without raising its damping torque value. Lack of damping torque will make the generator rotor oscillate. This non–muffled rotor oscillation will cause the generator loose from the system (out of step). Therefore, one solution that can be done is to make the arrangement (tuning) and activation of Power System Stabilizer (PSS) on the existing excitation control system. The control block diagram that owned by PSS can increase the damping torque and torque synchronization value of the generator in the same time so that the generator output response will be faster to reach steady state condition, shortly after the appearance of the disturbance. Eventually, the stability and reliability of Sumatra's electrical system from small signal stability disturbance will increase.<p align="justify"> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Based on Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) of PT PLN 2017 – 2026, there is an increase in total peak load that connected to the two of main electrical system in Sumatra (Northern and Southern Electrical System) become 5946 MW at the end of 2016. Thus, the power system’s reliability is necessary because the failure in overcoming any disruptions that can occur anytime, will result in stalled of electrical energy supply to serve load demand across the island. One of the possible disturbances is the disturbance to small signal stability. <br /> <br /> The excitation control system of generator’s inability in facing small signal stability problems will cause the rotor’s oscillation at low frequencies continuously. Generally, the use of Automatic Voltage Regulator (AVR) raise the rotor’s synchronization torque without raising its damping torque value. Lack of damping torque will make the generator rotor oscillate. This non–muffled rotor oscillation will cause the generator loose from the system (out of step). Therefore, one solution that can be done is to make the arrangement (tuning) and activation of Power System Stabilizer (PSS) on the existing excitation control system. The control block diagram that owned by PSS can increase the damping torque and torque synchronization value of the generator in the same time so that the generator output response will be faster to reach steady state condition, shortly after the appearance of the disturbance. Eventually, the stability and reliability of Sumatra's electrical system from small signal stability disturbance will increase.<p align="justify">
format Final Project
author ADJIE KURNIYA - NIM. 18014041 , MAHARDHIKA
spellingShingle ADJIE KURNIYA - NIM. 18014041 , MAHARDHIKA
#TITLE_ALTERNATIVE#
author_facet ADJIE KURNIYA - NIM. 18014041 , MAHARDHIKA
author_sort ADJIE KURNIYA - NIM. 18014041 , MAHARDHIKA
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/28710
_version_ 1822021794060566528