#TITLE_ALTERNATIVE#
<p align="justify">Based on Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) of PT PLN 2017 – 2026, there is an increase in total peak load that connected to the two of main electrical system in Sumatra (Northern and Southern Electrical System) become 5946 MW at the end of 2016. Th...
Saved in:
Main Author: | ADJIE KURNIYA - NIM. 18014041 , MAHARDHIKA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/28710 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EIGENVALUE SENSITIVITY APPROACH WITH GENERATOR REDISPATCH MECHANISM BASED ON UNIT COMMITMENT FOR DAMPING RATIO ENHANCEMENT OF POWER SYSTEM
by: Adjie Kurniya, Mahardhika -
#TITLE_ALTERNATIVE#
by: RIDHONMAS (NIM : 13308070), ADJIE -
#TITLE_ALTERNATIVE#
by: WIRANDHANA (NIM : 12213076), ADJIE -
#TITLE_ALTERNATIVE#
by: MAHARDHIKA CHRISTIANTI NIM : 11614026, LEVINA -
#TITLE_ALTERNATIVE#
by: SINDHU MAHARDHIKA (NIM 17003020), TOAN