#TITLE_ALTERNATIVE#

Production rate and separator pressure in gas field development have been determined early and should have fulfilled during a contract time. That characterictics made gas field development process different with oil field development process. High reservoir pressure at the beginning of field develop...

Full description

Saved in:
Bibliographic Details
Main Author: AULIA NABIGHA (NIM: 12212003), MUHAMMAD
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29148
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia