#TITLE_ALTERNATIVE#
Production rate and separator pressure in gas field development have been determined early and should have fulfilled during a contract time. That characterictics made gas field development process different with oil field development process. High reservoir pressure at the beginning of field develop...
Saved in:
Main Author: | AULIA NABIGHA (NIM: 12212003), MUHAMMAD |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29148 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: MUHAMMAD AULIA (NIM 132 02 083) , ULI -
#TITLE_ALTERNATIVE#
by: SIAMANDA (NIM : 12214101), AULIA -
#TITLE_ALTERNATIVE#
by: AULIA (NIM 12004040), NURUL -
#TITLE_ALTERNATIVE#
by: FITRAH (NIM 13504058), AULIA -
#TITLE_ALTERNATIVE#
by: FAJRINA (NIM : 15113003), AULIA