SIMULTANEOUS ASSEMBLY LINE DESIGN AND WORKFORCE SCHEDULING IN CN-235 AIRCRAFT FINAL ASSEMBLY LINE OF INDONESIA AEROSPACE COMPANY
PT Dirgantara Indonesia (PT DI) is an aeronautical company in Indonesia. One of the best products from PT DI is CN-235. Assembly process for this product conducted by 3 division, comprise of Detail Part Manufacturing (DPM), Component Assembly (CA), and Final Assembly Line (FAL). The main job of FAL...
Saved in:
Main Author: | RIZQULLAH NIM 13414018, NAUFAL |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29584 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OUTER WING OF PT DIRGANTARA INDONESIA CN-235 AIRCRAFT ASSEMBLY LINE IMPROVEMENT
by: Rosari Tambunan, Ester -
METHODOLOGY FOR OPERATION STANDARD TIME ADJUSTMENT IN FINAL ASSEMBLY LINE CN235 DIVISION PT DIRGANTARA INDONESIA
by: Immanuel, Evelyn -
THE PROPOSED DESIGN OF ASSEMBLY LINE TAIL UNIT CN235 AT PT DIRGANTARA INDONESIA
by: MELINDA SITORUS, GRACE -
A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
by: SEKAR ROSANIA - (13413046), NURIFFA -
OPERATOR ASSIGNMENT DESIGN IN PANELIZED ASSEMBLY LINE OF CENTER FUSELAGE CN235 AT PT DIRGANTARA INDONESIA
by: Uli Agnes Monica Gultom, Shinta