Simultaneous minimization of cycle time and workstations with stochastic task times in a continuous assembly line production system
Based on the literature and articles reviewed, there was not a single study that deals with the simultaneous determination of the cycle time and number of workstations under stochastic times. Most of the considered deterministic task times with only one objective which is minimizing the idle time in...
Saved in:
Main Author: | |
---|---|
Format: | text |
Language: | English |
Published: |
Animo Repository
1997
|
Subjects: | |
Online Access: | https://animorepository.dlsu.edu.ph/etd_masteral/1824 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | De La Salle University |
Language: | English |