Simultaneous minimization of cycle time and workstations with stochastic task times in a continuous assembly line production system
Based on the literature and articles reviewed, there was not a single study that deals with the simultaneous determination of the cycle time and number of workstations under stochastic times. Most of the considered deterministic task times with only one objective which is minimizing the idle time in...
محفوظ في:
المؤلف الرئيسي: | Chan, Juanito S. |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Animo Repository
1997
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://animorepository.dlsu.edu.ph/etd_masteral/1824 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | De La Salle University |
اللغة: | English |
مواد مشابهة
-
A bidirectional heuristic for stochastic assembly line balancing type II problem
بواسطة: Liu, S.B., وآخرون
منشور في: (2014) -
A system study on the production Department of Grasco Industries, Incorporated
بواسطة: Celis, Eugene Jacinto Borja, وآخرون
منشور في: (1996) -
Performance of cellular bucket brigades with hand-off times
بواسطة: LIM, Yun Fong
منشور في: (2017) -
On the asymptotic optimality of a simple on-line algorithm for the stochastic single-machine weighted completion time problem and its extensions
بواسطة: Chou, M.C., وآخرون
منشور في: (2013) -
Branch-and-bound algorithms for simple assembly line balancing problem
بواسطة: Liu, S.B., وآخرون
منشور في: (2014)