Simultaneous minimization of cycle time and workstations with stochastic task times in a continuous assembly line production system
Based on the literature and articles reviewed, there was not a single study that deals with the simultaneous determination of the cycle time and number of workstations under stochastic times. Most of the considered deterministic task times with only one objective which is minimizing the idle time in...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Animo Repository
1997
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://animorepository.dlsu.edu.ph/etd_masteral/1824 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|