TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA
<p align="justify"> <br /> <br /> Population growth and socio-economic improvement of the community, led to an increase in electricity demand in Java, while the national electrification ratio in 2013 only reached 83.2%, which means that there are still 20% of the people w...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29881 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:29881 |
---|---|
spelling |
id-itb.:298812018-06-25T11:07:16ZTECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA PUTRI PURNAMA (NIM : 15814036), OLIVIA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/29881 <p align="justify"> <br /> <br /> Population growth and socio-economic improvement of the community, led to an increase in electricity demand in Java, while the national electrification ratio in 2013 only reached 83.2%, which means that there are still 20% of the people who have not served their electricity needs. <br /> <br /> In accordance with the electricity conditions, the Government held a power plant development project to reach 35,000 MW within 5 years (2014-2019). Within 5 years, the government together with PLN and the private sector will build 109 plants; where one of them is the construction of PLTM Lambur in Lambur Village, Kandangserang District, Pekalongan Regency, Central Java Province. PLTM Run Off River (ROR) type is located on River Kali Genteng which has wide river basin of 74.92 km2. The mainstay debit to be used is 8 m3/s with 53% reliability. <br /> <br /> The results of this MHP planning resulted in a potential power of 4.83 MW with an annual energy production potential of 31.48 GWh. The construction cost of main building and embankment at power house at PLTM Lambur is approximately Rp. 19.678.483.774 billion rupiah with income Rp. 31.485.925.153 billion rupiah per year. <br /> <p align="justify"> text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
<p align="justify"> <br />
<br />
Population growth and socio-economic improvement of the community, led to an increase in electricity demand in Java, while the national electrification ratio in 2013 only reached 83.2%, which means that there are still 20% of the people who have not served their electricity needs. <br />
<br />
In accordance with the electricity conditions, the Government held a power plant development project to reach 35,000 MW within 5 years (2014-2019). Within 5 years, the government together with PLN and the private sector will build 109 plants; where one of them is the construction of PLTM Lambur in Lambur Village, Kandangserang District, Pekalongan Regency, Central Java Province. PLTM Run Off River (ROR) type is located on River Kali Genteng which has wide river basin of 74.92 km2. The mainstay debit to be used is 8 m3/s with 53% reliability. <br />
<br />
The results of this MHP planning resulted in a potential power of 4.83 MW with an annual energy production potential of 31.48 GWh. The construction cost of main building and embankment at power house at PLTM Lambur is approximately Rp. 19.678.483.774 billion rupiah with income Rp. 31.485.925.153 billion rupiah per year. <br />
<p align="justify"> |
format |
Final Project |
author |
PUTRI PURNAMA (NIM : 15814036), OLIVIA |
spellingShingle |
PUTRI PURNAMA (NIM : 15814036), OLIVIA TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA |
author_facet |
PUTRI PURNAMA (NIM : 15814036), OLIVIA |
author_sort |
PUTRI PURNAMA (NIM : 15814036), OLIVIA |
title |
TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA |
title_short |
TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA |
title_full |
TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA |
title_fullStr |
TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA |
title_full_unstemmed |
TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA |
title_sort |
technical planning of the 2 x 2.41 mw mini hydro power plant lambur in pekalongan regency, central java |
url |
https://digilib.itb.ac.id/gdl/view/29881 |
_version_ |
1821995547084455936 |