TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA

<p align="justify"> <br /> <br /> Population growth and socio-economic improvement of the community, led to an increase in electricity demand in Java, while the national electrification ratio in 2013 only reached 83.2%, which means that there are still 20% of the people w...

Full description

Saved in:
Bibliographic Details
Main Author: PUTRI PURNAMA (NIM : 15814036), OLIVIA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29881
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia