TECHNICAL PLANNING OF THE 2 X 2.41 MW MINI HYDRO POWER PLANT LAMBUR IN PEKALONGAN REGENCY, CENTRAL JAVA
<p align="justify"> <br /> <br /> Population growth and socio-economic improvement of the community, led to an increase in electricity demand in Java, while the national electrification ratio in 2013 only reached 83.2%, which means that there are still 20% of the people w...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29881 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |