AIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT

<p align="justify"> Aircraft maintenance scheduling is one of the major airline decisions during operation. Although aircraft maintenance scheduling is the final stage in an airline operation, it has the potential for cost savings. Sheduling problem is easy to understand but difficul...

Full description

Saved in:
Bibliographic Details
Main Author: FAJAR SULISTYA (NIM: 10111100), RIFQI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30477
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30477
spelling id-itb.:304772018-10-24T11:12:19ZAIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT FAJAR SULISTYA (NIM: 10111100), RIFQI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30477 <p align="justify"> Aircraft maintenance scheduling is one of the major airline decisions during operation. Although aircraft maintenance scheduling is the final stage in an airline operation, it has the potential for cost savings. Sheduling problem is easy to understand but difficult to solve given the complexity of its flight schedule and the large number of assigned aircraft. Aircraft maintenance scheduling problem aims to determine which aircraft should fly as well as when and where each aircraft must undergo the various levels of checks required by the Federal Aviation Administration. <br /> <br /> The goal is to minimize maintenance costs and expenses incurred during plane assignments in an airline route. This final project provides a formulation for scheduling treatments and a heuristic approach to solve the problem. The heuristic procedure provides a good solution within a reasonable computation time. This model can be used by medium-sized companies to optimize their maintenance costs.<p align="justify"> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify"> Aircraft maintenance scheduling is one of the major airline decisions during operation. Although aircraft maintenance scheduling is the final stage in an airline operation, it has the potential for cost savings. Sheduling problem is easy to understand but difficult to solve given the complexity of its flight schedule and the large number of assigned aircraft. Aircraft maintenance scheduling problem aims to determine which aircraft should fly as well as when and where each aircraft must undergo the various levels of checks required by the Federal Aviation Administration. <br /> <br /> The goal is to minimize maintenance costs and expenses incurred during plane assignments in an airline route. This final project provides a formulation for scheduling treatments and a heuristic approach to solve the problem. The heuristic procedure provides a good solution within a reasonable computation time. This model can be used by medium-sized companies to optimize their maintenance costs.<p align="justify"> <br />
format Final Project
author FAJAR SULISTYA (NIM: 10111100), RIFQI
spellingShingle FAJAR SULISTYA (NIM: 10111100), RIFQI
AIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT
author_facet FAJAR SULISTYA (NIM: 10111100), RIFQI
author_sort FAJAR SULISTYA (NIM: 10111100), RIFQI
title AIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT
title_short AIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT
title_full AIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT
title_fullStr AIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT
title_full_unstemmed AIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT
title_sort aircraft route optimization in 7 days cycle with maintenance constraint
url https://digilib.itb.ac.id/gdl/view/30477
_version_ 1822923276861571072