AIRCRAFT ROUTE OPTIMIZATION IN 7 DAYS CYCLE WITH MAINTENANCE CONSTRAINT

<p align="justify"> Aircraft maintenance scheduling is one of the major airline decisions during operation. Although aircraft maintenance scheduling is the final stage in an airline operation, it has the potential for cost savings. Sheduling problem is easy to understand but difficul...

Full description

Saved in:
Bibliographic Details
Main Author: FAJAR SULISTYA (NIM: 10111100), RIFQI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30477
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia