PERANCANGAN LINTAS PERAKITAN OVERHEAD LINE DENGAN PENDEKATAN LEAN MANUFACTURING DALAM PROSES PRODUKSI BMW X1 (F48) DI PT GAYA MOTOR
In 2017, BMW Group Indonesia (BGI) announced the highest achievement by a massive <br /> <br /> increase of BMW sales. In the first quarter of 2018, there was also an increase in BMW sales <br /> <br /> compared to the same period in 2017. Of these two achievements, the BMW X...
Saved in:
Main Author: | APRILIANO YOSANDI NIM 13414059, YASSER |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/31712 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENGEMBANGAN ALGORITMA METAHEURISTIK SIMULATED ANNEALING UNTUK PERANCANGAN LINTAS PERAKITAN DENGAN ALTERNATIF URUTAN PERAKITAN DAN PROSES PERAKITAN MENGGUNAKAN KOLABORASI MANUSIA-ROBOT
by: Puspa Miranti, Evita -
PENGEMBANGAN ALGORITMA GENETIKA UNTUK PERANCANGAN LINTAS PERAKITAN DENGAN ALTERNATIF URUTAN PERAKITAN DAN PERAKITANNYA MENGGUNAKAN KOLABORASI MANUSIA-ROBOT
by: Ramaputri, Faradiva -
PERANCANGAN PERBAIKAN LEAD TIME PERAKITAN PADA DIVISI FABRIKASI PT X DENGAN MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING
by: Fathahillah Shidiq, Ahmad -
PERANCANGAN LINTAS PERAKITAN PRODUK KAP LAMPU VALEX VOLIFIX PT VALENSI CAHAYA PERSADA
by: Abdulghani, Ibrahim -
STADION BMW SUNTER JAKARTA
by: Bukhari Tarigan, Belly