TERMINAL 2 OF HANG NADIM BATAM INTERNATIONAL AIRPORT

Terminal 2 of Hang Nadim International Airport is located in Batam, has a capacity of 8 million passengers per annum with 2,600 international typically passenger peak hours and 2,900 domestic typically passenger peak hours. The project is held by BP Batam with the aim of meeting the needs of the inc...

Full description

Saved in:
Bibliographic Details
Main Author: Tirana, Juda
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/33026
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:33026
spelling id-itb.:330262019-01-10T10:07:59ZTERMINAL 2 OF HANG NADIM BATAM INTERNATIONAL AIRPORT Tirana, Juda Arsitektur Indonesia Final Project Airport, Batam, Energy-efficient, Intuitive, Passengers INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/33026 Terminal 2 of Hang Nadim International Airport is located in Batam, has a capacity of 8 million passengers per annum with 2,600 international typically passenger peak hours and 2,900 domestic typically passenger peak hours. The project is held by BP Batam with the aim of meeting the needs of the increasing flight passengers demand. Hang Nadim Airport is a class 4E airport which will be an international hub for Indonesian airlines and operates 24 hours a day. This terminal building with 88,000 square meters coverage is designed with unique arc steel structure system as a modern expression of the city of Batam as a city of trade and industrial investment. The main concept of project is ‘Intuitive Wayfinding through Spatial Experience’, expecting passengers can enjoy a pleasant flight with the pre-flight process easy and convenient. In this project, there are design approaches by function, shape, and construction which seeks to achieve a balance in turning the terminal building into representation of Batam, provides a comfortable experience for passengers by shortening the walk distance, as well as ease of the terminal construction. Terminal 2 Hang Nadim International Airport is designated to be part of Eco Airport, announced by the Ministry of Civil Aviation. The concept of Eco Airport achieved through the optimization of natural lighting during the day and the use of energy-efficient air conditioning system in the terminal building. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Arsitektur
spellingShingle Arsitektur
Tirana, Juda
TERMINAL 2 OF HANG NADIM BATAM INTERNATIONAL AIRPORT
description Terminal 2 of Hang Nadim International Airport is located in Batam, has a capacity of 8 million passengers per annum with 2,600 international typically passenger peak hours and 2,900 domestic typically passenger peak hours. The project is held by BP Batam with the aim of meeting the needs of the increasing flight passengers demand. Hang Nadim Airport is a class 4E airport which will be an international hub for Indonesian airlines and operates 24 hours a day. This terminal building with 88,000 square meters coverage is designed with unique arc steel structure system as a modern expression of the city of Batam as a city of trade and industrial investment. The main concept of project is ‘Intuitive Wayfinding through Spatial Experience’, expecting passengers can enjoy a pleasant flight with the pre-flight process easy and convenient. In this project, there are design approaches by function, shape, and construction which seeks to achieve a balance in turning the terminal building into representation of Batam, provides a comfortable experience for passengers by shortening the walk distance, as well as ease of the terminal construction. Terminal 2 Hang Nadim International Airport is designated to be part of Eco Airport, announced by the Ministry of Civil Aviation. The concept of Eco Airport achieved through the optimization of natural lighting during the day and the use of energy-efficient air conditioning system in the terminal building.
format Final Project
author Tirana, Juda
author_facet Tirana, Juda
author_sort Tirana, Juda
title TERMINAL 2 OF HANG NADIM BATAM INTERNATIONAL AIRPORT
title_short TERMINAL 2 OF HANG NADIM BATAM INTERNATIONAL AIRPORT
title_full TERMINAL 2 OF HANG NADIM BATAM INTERNATIONAL AIRPORT
title_fullStr TERMINAL 2 OF HANG NADIM BATAM INTERNATIONAL AIRPORT
title_full_unstemmed TERMINAL 2 OF HANG NADIM BATAM INTERNATIONAL AIRPORT
title_sort terminal 2 of hang nadim batam international airport
url https://digilib.itb.ac.id/gdl/view/33026
_version_ 1822923934350180352