EVALUASI DAN DESAIN ULANG INSTALASI PENGOLAHAN AIR BERSIH DI PANTI ASUHAN TUNAS HARAPAN
In some urban areas with lower economic level, there are still cases of inability of occupants to pay water supply bill from government. Therefore, to fulfill the water supply needs, required incomplex water treatment plant. Moreover, water sources too become a problem. Ground water is one of the wa...
Saved in:
Main Author: | Andhika Putra, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/34826 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERENCANAAN ALTERNATIF PENGOLAHAN BIOLOGI PADA INSTALASI PENGOLAHAN AIR TERPRODUKSI DI INDUSTRI MIGAS
by: Andika Firmansyah, Muhammad -
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK
by: Zaitoon, Armafitriani -
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL) DI KOTA KEDIRI
by: Akbar Santosa, Jevien -
DESAIN WET SCRUBBER UNTUK PENGENDALIAN PARTIKULAT PADA INDUSTRI PENGOLAHAN KELAPA SAWIT
by: Arief Noverianto, Muhammad -
PRA-RANCANG INSTALASI PENGOLAHAN SAMPAH DI TPA CIPEUCANG KOTA TANGERANG SELATAN
by: Annisa, Diandra