RESOURCE ALLOCATION AND DESIGN CASH FLOW OF CONSTRUCTION PROJECT BUILDING CENTER FOR ADVANCED SCIENCES INSTITUT TEKNOLOGI BANDUNG (CAS-ITB)
To realize the ideals of the Institut Teknologi Bandung (ITB) as a world class university, development plan, that includes the development of programs and facilities, is needed. One of the planned facility development by ITB is the construction of the Center for Advanced Sciences (CAS) Building....
Saved in:
Main Author: | Syukrika, Alessandra |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/35330 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB
by: Andriyani Teguh, Novi -
OPTIMIZATION OF PAU ITB DATA CENTER COOLING SYSTEM
by: Ridlo Iqbal Mukaffi, Akhmad -
OPTIMIZATION OF PAU ITB DATA CENTER COOLING SYSTEM
by: Sanditya Arief, Rizky -
OPTIMIZATION STUDY OF VISUAL COMFORT AND DAYLIGHT AVAILABILITY AT CENTER OF ART DESIGN, AND LANGUAGE (CADL) INSTITUT TEKNOLOGI BANDUNG
by: Tris Hibatullah, Aflin -
OPTIMIZATION STUDY OF VISUAL COMFORT AND DAYLIGHT AVAILABILITY AT CENTER OF ART DESIGN, AND LANGUAGE (CADL) INSTITUT TEKNOLOGI BANDUNG
by: Akbar Anthony Siregar, Mhd