COMPARATIVE ANALYSIS OF GROUND IMPROVEMENT USING PREFABRICATED VERTICAL DRAIN METHOD AND STONE COLUMN METHOD, PROJECT CASE STUDY IN STOCK YARD COAL TERMINAL LUBUK TUTUNG, EAST KALIMANTA
To overcome the problem of soft soil bearing capacity can be done in various ways such as improving the condition of the land base and improve the system load. Improve loading system in question is the gradual loading. With the gradual loading is expected to increase the bearing capacity of the s...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/35584 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |