COMPARATIVE ANALYSIS OF GROUND IMPROVEMENT USING PREFABRICATED VERTICAL DRAIN METHOD AND STONE COLUMN METHOD, PROJECT CASE STUDY IN STOCK YARD COAL TERMINAL LUBUK TUTUNG, EAST KALIMANTA
To overcome the problem of soft soil bearing capacity can be done in various ways such as improving the condition of the land base and improve the system load. Improve loading system in question is the gradual loading. With the gradual loading is expected to increase the bearing capacity of the s...
Saved in:
Main Author: | Maulana Saputra, Muhamad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/35584 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
COMPARATIVE ANALYSIS METHOD OF SOFT SOIL IMPROVEMENT PREFABRICATED VERTICAL DRAIN WITH SAND COMPACTION PILE, CASE STUDY OF LAND PREPARATION COAL TERMINAL PORT SITE, LUBUK TUTUNG KALIMANTAN
by: Nosa A, Anggoro -
OUTSOURCING IN OPERATION AND MAINTENANCE SERVICES FOR LUBUK TUTUNG COAL TERMINAL OF PT KALTIM PRIMA COAL
by: Laily, Alfan -
Installation stress in prefabricated vertical drains
by: Karunaratne, G.P., et al.
Published: (2014) -
Soft clay consolidation accelerated by prefabricated vertical drains
by: Neo, Ying Min
Published: (2020) -
Prefabricated and electrical vertical drains for consolidation of soft clay
by: Karunaratne, G.P.
Published: (2014)