THE APPLICATION OF AS-BUILT BUT-FOR SCHEDULE ANALYSIS METHOD FOR CONSTRUCTION PROJECTS
The construction project is an activities that is always bound by the constraints of time and financial resources. But nearly 80% in the execution of construction projects has been delayed. This delay would be detrimental to the project owner and the contractor. Delay analysis is performed to determ...
Saved in:
Main Author: | Ramadhani, Sofyan |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/36430 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE APPLICATION OF AS-BUILT BUT-FOR SCHEDULE ANALYSIS METHOD FOR CONSTRUCTION PROJECTS
by: Ramadhani, Sofyan -
DESIGN OF CONSTRUCTION IMPLEMENTATION METHODS, SCHEDULING, AND ESTIMATION OF CONSTRUCTION COSTS PROJECT BALIKPAPAN FOOTBALL STADION PROJECT
by: Fadhli Mubarak, Muhammad -
Built to Scale: the project book
by: Lim Qiao Tong, et al.
Published: (2023) -
IMPROVING PROJECT SCHEDULE ACCURACY OF MEDIUM SCALE CONSTRUCTION PROJECT THROUGH PERT ANALYSIS.
by: Hidayatullah, Roby -
CONSTRUCTION MANAGEMENT DESIGN OF CENTER FOR INFRASTRUCTURE AND BUILT ENVIRONMENT (CIBE) ITB MAIN BUILDING PROJECT
by: JOSUA SIMAMORA (NIM : 15011150), NAEL