CONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG

Nowadays, infrastructure development projects are emerging in this country, one of those projects is construction project of Laboratorium Uji Doping Institut Teknologi Bandung which is in maintenance phase now. Construction delivery planning is required for any construction project in order to ke...

Full description

Saved in:
Bibliographic Details
Main Author: Adhisty, Lydwina
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/36559
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:36559
spelling id-itb.:365592019-03-13T14:22:40ZCONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG Adhisty, Lydwina Pengadilan & peradilan Indonesia Final Project implementation method, scheduling, cash flow INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36559 Nowadays, infrastructure development projects are emerging in this country, one of those projects is construction project of Laboratorium Uji Doping Institut Teknologi Bandung which is in maintenance phase now. Construction delivery planning is required for any construction project in order to keep the construction works away from any resistance. The purposes of this thesis are to re-planning the building’s construction delivery planning which consists of implementation method, scheduling, and the project’s cash flow; and also suggest a change on the implementation method which planned by contractor. The case study is done by observing contractor’s specification documents, bill of quantity, and project’s S-curve. From this case study, a new idea of implementation method can be delivered. Scheduling are planned by applying Critical Path Method and using Microsoft Project. Scheduling is also planned with different duration from contractor’s duration. Cash flow is planned by considering the new duration and the change suggestion. At the final, the results are a change of material from red brick to Celcon brick, and the project’s duration is 191 days. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pengadilan & peradilan
spellingShingle Pengadilan & peradilan
Adhisty, Lydwina
CONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG
description Nowadays, infrastructure development projects are emerging in this country, one of those projects is construction project of Laboratorium Uji Doping Institut Teknologi Bandung which is in maintenance phase now. Construction delivery planning is required for any construction project in order to keep the construction works away from any resistance. The purposes of this thesis are to re-planning the building’s construction delivery planning which consists of implementation method, scheduling, and the project’s cash flow; and also suggest a change on the implementation method which planned by contractor. The case study is done by observing contractor’s specification documents, bill of quantity, and project’s S-curve. From this case study, a new idea of implementation method can be delivered. Scheduling are planned by applying Critical Path Method and using Microsoft Project. Scheduling is also planned with different duration from contractor’s duration. Cash flow is planned by considering the new duration and the change suggestion. At the final, the results are a change of material from red brick to Celcon brick, and the project’s duration is 191 days.
format Final Project
author Adhisty, Lydwina
author_facet Adhisty, Lydwina
author_sort Adhisty, Lydwina
title CONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG
title_short CONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG
title_full CONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG
title_fullStr CONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG
title_full_unstemmed CONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG
title_sort construction delivery planning of laboratorium uji doping institut teknologi bandung
url https://digilib.itb.ac.id/gdl/view/36559
_version_ 1822268718614315008