CONSTRUCTION DELIVERY PLANNING OF LABORATORIUM UJI DOPING INSTITUT TEKNOLOGI BANDUNG
Nowadays, infrastructure development projects are emerging in this country, one of those projects is construction project of Laboratorium Uji Doping Institut Teknologi Bandung which is in maintenance phase now. Construction delivery planning is required for any construction project in order to ke...
Saved in:
Main Author: | Adhisty, Lydwina |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/36559 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE APPLICATION OF AS-BUILT BUT-FOR SCHEDULE ANALYSIS METHOD FOR CONSTRUCTION PROJECTS
by: Ramadhani, Sofyan -
PERFORMANCE OF REINFORCED CONCRETE STRUCTURE â DUAL SYSTEM WITH SEISMIC PROTECTION SYSTEM VISCOELASTIC DAMPER âINVERTED Vâ
by: Saputra Gunawan, Andri -
PERFORMANCE STUDIES OF REINFORCED CONCRETE STRUCTURE WITH DUAL SYSTEM USING VISCOELASTICDAMPED BRACE DUE TO STRONG EARTHQUAKE BASE ON SNI 1726-2012
by: Cipta Wiguna, Eka -
Theoritical Study of Active Tendon System on Structure of Hospital Building in Depok
by: Alfajri, Irvan -
PERANCANGAN STRUKTUR BAJA BERPENGAKU EKSENTRIK UNTUK BANGUNAN BERISIKO TINGGI BERDASARKAN SNI 1726-2012
by: Guirralda, Marciella