DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS
PT Y, which is engaged in the production of NX type aircraft, is currently targeted to complete eleven aircraft within two years. In other words the cycle time for making an NX plane is 300 hours. One unique characteristic in NX aircraft assembly is the complexity of each element of work. This cause...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39508 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |