DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS
PT Y, which is engaged in the production of NX type aircraft, is currently targeted to complete eleven aircraft within two years. In other words the cycle time for making an NX plane is 300 hours. One unique characteristic in NX aircraft assembly is the complexity of each element of work. This cause...
Saved in:
Main Author: | AFIANTO, BAGAS |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39508 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
“EVERY CREED AND EVERY RACE, HAS IT’S ROLE AND HAS IT’S PLACE”: HOW EMOTIONAL WORK IN THE NATIONAL SERVICE CONTRIBUTES TO THE CONSTRUCTION OF GENDERED ROLES BY THE STATE
by: GENE TAN HUI EN
Published: (2020) -
MODEL DEVELOPMENT OF FACTORS THAT INFLUENCE WORK-LIFE BALANCE
by: Hanifa Sari, Dini -
Reimagining balance in the work-non-work domain
by: Ranieses, Jessica Jaye
Published: (2024) -
"Work-in-Life" : reconsidering work-life balance in Singapore
by: Wee, Ying Wei
Published: (2016) -
Factors Impacting Work Family Balance of Working Mothers
by: Fathul Himam, FHimam
Published: (2015)