DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS

PT Y, which is engaged in the production of NX type aircraft, is currently targeted to complete eleven aircraft within two years. In other words the cycle time for making an NX plane is 300 hours. One unique characteristic in NX aircraft assembly is the complexity of each element of work. This cause...

Full description

Saved in:
Bibliographic Details
Main Author: AFIANTO, BAGAS
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/39508
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:39508
spelling id-itb.:395082019-06-26T14:52:31ZDEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS AFIANTO, BAGAS Indonesia Theses number of operators, work elements, assembly trajectory, cycle time, smoothness index INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39508 PT Y, which is engaged in the production of NX type aircraft, is currently targeted to complete eleven aircraft within two years. In other words the cycle time for making an NX plane is 300 hours. One unique characteristic in NX aircraft assembly is the complexity of each element of work. This causes one work department to be done by multi operators. The time of completion of an element of work will depend on how many operators are assigned to complete the work sheet. Researches related to the design of assembly lines generally have an objective function to minimize the time difference between work stations. This research focuses on the design of assembly lines for work elements that are long and can be done by multi operators. This study aims to develop an assembly line design model where each element of work can be done by multi operators. The results of the model trials produce a feasible solution and meet the specified cycle time. The model has limitations in computational time so that not all results are optimal. Computational results show the number of operators from 80 to 60, the cycle time from 1018.04 to 278.5. SI from 3007.78 to 554.3 the number of stations from 14 to 16. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Y, which is engaged in the production of NX type aircraft, is currently targeted to complete eleven aircraft within two years. In other words the cycle time for making an NX plane is 300 hours. One unique characteristic in NX aircraft assembly is the complexity of each element of work. This causes one work department to be done by multi operators. The time of completion of an element of work will depend on how many operators are assigned to complete the work sheet. Researches related to the design of assembly lines generally have an objective function to minimize the time difference between work stations. This research focuses on the design of assembly lines for work elements that are long and can be done by multi operators. This study aims to develop an assembly line design model where each element of work can be done by multi operators. The results of the model trials produce a feasible solution and meet the specified cycle time. The model has limitations in computational time so that not all results are optimal. Computational results show the number of operators from 80 to 60, the cycle time from 1018.04 to 278.5. SI from 3007.78 to 554.3 the number of stations from 14 to 16.
format Theses
author AFIANTO, BAGAS
spellingShingle AFIANTO, BAGAS
DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS
author_facet AFIANTO, BAGAS
author_sort AFIANTO, BAGAS
title DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS
title_short DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS
title_full DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS
title_fullStr DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS
title_full_unstemmed DEVELOPMENT OF WORK LOAD BALANCING MODEL AND DETERMINATION OF NUMBER OF OPERATORS FOR EVERY ELEMENT OF WORK ON ASSEMBLY CROSS
title_sort development of work load balancing model and determination of number of operators for every element of work on assembly cross
url https://digilib.itb.ac.id/gdl/view/39508
_version_ 1822269277679386624