THE PROBABILISTIC METHOD FOR DETERMINING THE NUMBER OF GEOTHERMAL WELLS FOR POWER PLANT DEVELOPMENT
The uncertainty and risk during presuming the number of geothermal wells (production, reinjection, and make-up well) in the feasibility study are caused by the lack of data about the wells and the field properties. The source of the uncertainty is the different characteristics in the wells, such as...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39833 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |