THE PROBABILISTIC METHOD FOR DETERMINING THE NUMBER OF GEOTHERMAL WELLS FOR POWER PLANT DEVELOPMENT

The uncertainty and risk during presuming the number of geothermal wells (production, reinjection, and make-up well) in the feasibility study are caused by the lack of data about the wells and the field properties. The source of the uncertainty is the different characteristics in the wells, such as...

Full description

Saved in:
Bibliographic Details
Main Author: Vernando Salim, Feri
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/39833
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia