METHODOLOGY FOR OPERATION STANDARD TIME ADJUSTMENT IN FINAL ASSEMBLY LINE CN235 DIVISION PT DIRGANTARA INDONESIA
PT Dirgantara Indonesia is a company which produce, market, sell, and distribute aerospace, defense and security things. One of its products is CN235 plane. The problem faced in CN235 production is production target cannot be achieved by PT Dirgantara Indonesia. This unachieved production target cau...
Saved in:
Main Author: | Immanuel, Evelyn |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39872 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPERATOR ASSIGNMENT DESIGN IN PANELIZED ASSEMBLY LINE OF CENTER FUSELAGE CN235 AT PT DIRGANTARA INDONESIA
by: Uli Agnes Monica Gultom, Shinta -
OUTER WING OF PT DIRGANTARA INDONESIA CN-235 AIRCRAFT ASSEMBLY LINE IMPROVEMENT
by: Rosari Tambunan, Ester -
THE PROPOSED DESIGN OF ASSEMBLY LINE TAIL UNIT CN235 AT PT DIRGANTARA INDONESIA
by: MELINDA SITORUS, GRACE -
A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
by: SEKAR ROSANIA - (13413046), NURIFFA -
SIMULTANEOUS ASSEMBLY LINE DESIGN AND WORKFORCE SCHEDULING IN CN-235 AIRCRAFT FINAL ASSEMBLY LINE OF INDONESIA AEROSPACE COMPANY
by: RIZQULLAH NIM 13414018, NAUFAL