Understanding of Sand Production Rate Through Van Den Hoek And Geilikmanâs Analytical Model
Sand production from sandstone resevoir should be anticipated before producing oil/gas wells. Sand production in well needs sand control equipment installation that requires a sufficient cost and also especially for offshore well, it cost very expensive for rig mobilization to conduct well intervent...
Saved in:
Main Author: | Rafi, Ahmad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40068 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
NUMERICAL MODELLING OF TRIAXIAL TEST USING FINITE DIFFERENCE METHOD WITH HOEK-BROWN FAILURE CRITERION
by: Nabila Tsamara Firtania, Muthia -
STUDY OF MESH DEPENDENCY ON NUMERICAL MODELING FOR SLOPE STABILITY ANALYSIS BASED ON HOEK-BROWN CRITERIA
by: Sutriadi -
NUMERIC MODELING FOR DETERMINATION OF THE CRUSHING ZONE THICKNESS AROUND THE TUNNEL BASED ON MOHRCOULOMB AND HOEK-BROWN CRITERIA
by: Lumbantobing, Andrew -
MESH DEPENDENCY STUDY USING NUMERICAL MODELING FOR PILLAR STABILITY ANALYSIS BASED ON THE HOEK-BROWN CRITERIA
by: Alif Lam Ha, Abda -
ANALYSIS OF THE MOHR-COULOMB AND HOEK-BROWN FAILURE CRITERIA ON SEDIMENTARY ROCK AND COAL
by: Santoso, Reinaldi