DEVELOPMENT MODEL OF A GEOTHERMAL FIELD IN THE EASTERN PART OF INDONESIA WITH GEOTHERMAL FUND INVOLVEMENT
Indonesian government has set an ambitious target of 23% renewable energy mix in 2025 as stated in National Energy Policy. For that purpose, geothermal is expected to contribute 7.2 GW. Efforts from both government and contractors are needed to reach this goal. From government side, supporting polic...
Saved in:
Main Author: | Arlis, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40075 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GEOTHERMAL DEVELOPMENT STRATEGY FOR EASTERN INDONESIA
by: Fabian Moningka, Milki -
FEASIBILITY STUDY MEDIUM ENTHALPY IN EASTERN INDONESIA: CASE STUDY TULEHU GEOTHERMAL FIELD
by: Tawakal, Adrian -
GEOTHERMAL SYSTEM MODELLING BASED ON GRAVITY DATA OF KEPAHIANG GEOTHERMAL FIELD, BENGKULU, INDONESIA
by: Firdian Saputra, Anggi -
MODELING OF GEOTHERMAL SYSTEM BASED ON GRAVITY DATA OF TALU â TOMBANG, GEOTHERMAL FIELD, WEST SUMATERA, INDONESIA
by: Oktada Hilman Lafayto, Muhammad -
ENERGY OPTIMIZATION MODELING OF GEOTHERMAL POWER PLANT (CASE STUDY : DARAJAT GEOTHERMAL FIELD UNIT III, PT. CHEVRON GEOTHERMAL INDONESIA)
by: H.M.S. (NIM : 22611008); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, RIZAL