INCREMENTAL DEVELOPMENT STRATEGY OF GEOTHERMAL FIELD USING WELLHEAD UNIT TECHNOLOGY: CASE STUDY ULUMBU GEOTHERMAL FIELD

Geothermal development in Indonesia is still dominated by the utilization of conventional geothermal power plants with large capacities. It generally requires a long time and often experience delays in the operation process. The purpose of this study is to provide alternative production options for...

Full description

Saved in:
Bibliographic Details
Main Author: Idianto, Onny
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/48339
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia