INCREMENTAL DEVELOPMENT STRATEGY OF GEOTHERMAL FIELD USING WELLHEAD UNIT TECHNOLOGY: CASE STUDY ULUMBU GEOTHERMAL FIELD
Geothermal development in Indonesia is still dominated by the utilization of conventional geothermal power plants with large capacities. It generally requires a long time and often experience delays in the operation process. The purpose of this study is to provide alternative production options for...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/48339 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |