INCREMENTAL DEVELOPMENT STRATEGY OF GEOTHERMAL FIELD USING WELLHEAD UNIT TECHNOLOGY: CASE STUDY ULUMBU GEOTHERMAL FIELD
Geothermal development in Indonesia is still dominated by the utilization of conventional geothermal power plants with large capacities. It generally requires a long time and often experience delays in the operation process. The purpose of this study is to provide alternative production options for...
Saved in:
Main Author: | Idianto, Onny |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/48339 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FIELD DEVELOPMENT STUDY OF ULUMBU GEOTHERMAL FIELD BASED ON RESERVOIR SIMULATION
by: KURNIAWAN , IQBAL -
OPTIMIZATION OF GEOTHERMAL POWER PRODUCTION (CASE STUDY ULUMBU GEOTHERMAL POWER PRODUCTION UNIT 4 ULUMBU GEOTHERMAL WORKING AREA NTT, INDONESIA)
by: Ediatmaja, Prajamukti -
DESIGN OF FLOW PIPELINE IN GEOTHERMAL FIELD WITH WELLHEAD GENERATING UNIT TYPE
by: Valeska, Gian -
UPDATING CONCEPTUAL MODEL OF ULUMBU GEOTHERMAL FIELD USING NUMERICAL SIMULATION
by: Karunia Hammad, Fadhil -
A NATURAL STATE MODELLING OF ULUMBU GEOTHERMAL FIELD, EAST NUSA TENGGARA, INDONESIA
by: Kurniawan, Iqbal