PRE-FEASIBILITY STUDY OF WELLHEAD GENERATING UNIT UTILIZATION IN PARTIALLY VAPOR DOMINATED SYSTEM

The development of geothermal fields needs 5-6 years from the first well drilled until the operation of the central power plant. Between the gap years, the wells will be shut in and will be re-opened when the power plant is ready. However, there is an alternative to utilize the wells with Wellhead G...

Full description

Saved in:
Bibliographic Details
Main Author: Alwy Dahlan, Muhammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/40139
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia