PRE-FEASIBILITY STUDY OF WELLHEAD GENERATING UNIT UTILIZATION IN PARTIALLY VAPOR DOMINATED SYSTEM
The development of geothermal fields needs 5-6 years from the first well drilled until the operation of the central power plant. Between the gap years, the wells will be shut in and will be re-opened when the power plant is ready. However, there is an alternative to utilize the wells with Wellhead G...
Saved in:
Main Author: | Alwy Dahlan, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40139 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF FLOW PIPELINE IN GEOTHERMAL FIELD WITH WELLHEAD GENERATING UNIT TYPE
by: Valeska, Gian -
FEASIBILITY STUDY OF DIRECTIONAL DRILLING OPERATION FOR WELLHEAD RELOCATION
by: SATRIO FADJRI (NIM 12206028); Pembimbing: Prof. Dr.-Ing. Ir. Rudi Rubiandini R.S., FADLI -
DESIGN, MANUFACTURE, AND TEST OF THERMOELECTRIC GENERATOR SYSTEM WITH THE HEAT SOURCE FROM THE WELLHEAD OF GEOTHERMAL WELL.
by: Rahman Handoko, Fathur -
INCREMENTAL DEVELOPMENT STRATEGY OF GEOTHERMAL FIELD USING WELLHEAD UNIT TECHNOLOGY: CASE STUDY ULUMBU GEOTHERMAL FIELD
by: Idianto, Onny -
DESIGN AND LIFTING ANALYSIS WELLHEAD PLATFORM WITH BRACED MONOPOD TYPE AT THE JAVA SEA
by: Mizan Muslim - NIM 15514001 , Muhammad