THE RISK MANAGEMENT OF INTERNATIONAL EPC PROJECTS: BY THE CASE STUDY-INDONESIA S POWER PLANT PROJECT
The implementation of the strategy in China has gradually shifted many of China's general contracting engineering business from domestic to international markets. However, with the fierce competition in the international general contracting engineering market, the occurrence of financia...
Saved in:
Main Author: | Siwei, Shen |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40513 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT CRITERIA AND WEIGHTED IN EVALUATION STAGE OF SUPPLIER SELECTION AT GAS ENGINE POWER PLANT EPC PROJECT
by: DWI PRASETYO NIM 94516011, ERLANGGA -
STORAGE FACILITY LAYOUT DESIGN OF CONSTRUCTION PROJECT Case Study: EPC Terminal LPG Refrigerated Project
by: LOKANTA NIM 13414039, GIOTAMA -
RISK MANAGEMENT OF DELAY IN THE PLTU EPC PROJECT (A REVIEW OF IMPACTS OF IMPERFECT BASIC DESIGN INFORMATION)
by: Handayani Siregar, Meliza -
RISK MANAGEMENT ANALYSIS FOR CIATER GEOTHERMAL POWER PLANT PROJECT CASE STUDY PT.XYZ
by: ADITYA (NIM : 29107072); Pembimbing: Erman Sumirat, SE.Ak, M.Buss (Finance), YAYANG -
FINANCIAL RISK ANALYSIS EPC PROJECT: CASE STUDY ON JAWA 9 &10 (2 X 1000 MW) CFSPP-SURALAYA
by: Handoko, Tri