PROJECT CONTROL IMPROVEMENTS IN DEEP GROUNDWATER DRILLING WORK AT PT SAMBONG CATUR KARSA
Indonesia has different geological conditions from one region to another. Specifically for certain geological conditions, the community is not easy to get groundwater and needs to be done by using drilling technology that requires; water availability survey, drilling equipment, and water treatment f...
Saved in:
Main Author: | Zharfan Rashif, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/41375 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DETERMINING THE INTRINSIC VALUE OF PT ARMINDO CATUR PRATAMA
by: Muhroni -
HWU DRILLING PROJECT INVESTMENT ANALYSIS (CASE STUDY OF HWU DRILLING AS RIG REPLACEMENT PROJECT AT TANO FIELD, SINAMBUNG BLOCK)
by: Rhama Priwanza, Herfran -
OPTIMIZATION OF DRILLING PARAMETER IN DRILLING OUT CEMENT ACTIVITY TO IMPROVE WORKOVER PERFORMANCE USING DESIGN OF EXPERIMENT (CASE STUDY: PT BOS*)
by: Yudi Permana, Didit -
OPTIMIZATION OF DRILLING PARAMETER IN DRILLING OUT CEMENT ACTIVITY TO IMPROVE WORKOVER PERFORMANCE USING DESIGN OF EXPERIMENT (CASE STUDY: PT BOS*)
by: Yudi Permana, Didit -
DEVELOPMENT OF COST BOOK & DIGITAL DASHBOARD TO IMPROVE COST MONITORING IN DRILLING & COMPLETIONS
by: Wijaya, Candy