Determination and Preparation Maintenance Procedure of Metro Capsuleâs System Based on Reliability- Centered Maintenanceâs Method
Metro capsule is a innovation of mass railway transportation that is being developed by PT. TReKKa (Teknik Rekayasa Kereta Kapsul), ITB (especially mechanical engineering design center laboratory and product design), and also BAMEC (Bandung Mechatronic Center). Metro capsule will be produced on r...
Saved in:
Main Author: | Doly Fererra, Kevin |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/41936 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Determination and Preparation Maintenance Procedure of Metro Capsuleâs System Based on Reliability-Centered Maintenanceâs Method
by: Doly Fererra, Kevin -
Determination and Preparation Maintenance Procedure of Metro Capsuleâs Structure based on Reliability-Centered Maintenance
by: Adi Putra Hutabarat, Philips -
Determination and Preparation Maintenance Procedure of Metro Capsuleâs Structure based on Reliability-Centered Maintenance
by: Adi Putra Hutabarat, Philips -
MAINTENANCE STRATEGY FOR LOCOMOTIVE CC 201 USING RISK-BASED RELIABILITY CENTERED MAINTENANCEÂ (RCM3)Â METHOD
by: Radios Catur Putri, Crytelana -
Strength Analysis of Metro Capsuleâs Bogie Component
by: Azarya Harjandi, Yosua