THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA

PT Dirgantara Indonesia (PT DI), a state-owned enterprises (BUMN) in Indonesia, mainly produces airplane and helicopter. NC-212i becomes the most favourite airplane in 2019. Based on latest data, PT DI is not yet accomplish their target within 2 months. It took 4 months for Final Assembly Line (FAL)...

Full description

Saved in:
Bibliographic Details
Main Author: RADITA FARIZKI, ZEIN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/42095
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:42095
spelling id-itb.:420952019-09-13T13:51:11ZTHE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA RADITA FARIZKI, ZEIN Indonesia Final Project utilization, operator’s skill, idle time, assignment INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/42095 PT Dirgantara Indonesia (PT DI), a state-owned enterprises (BUMN) in Indonesia, mainly produces airplane and helicopter. NC-212i becomes the most favourite airplane in 2019. Based on latest data, PT DI is not yet accomplish their target within 2 months. It took 4 months for Final Assembly Line (FAL) Division to produce a unit of NC-212i. Based on analysis, low utilization of the operator is the root cause of this problem. This research aims to decide which model and assignment method of operator in assembly line that suitable to achieve production target and maximize operator’s utilization. Methods used in this research were analytical model and heuristic procedure. Analytical model is used to minimize total operator idle time considering the operator’s skill level. CPLEX Optimization Studio 12.9.0 is used to execute this model. Heuristic procedure is developed to accommodate data processing that can not be done using analytical model. Several steps describing mathematical equation used in analytical model construct this procedure. Solution resulted in this research are operator assignment and operation’s start time. Computation is done for every work station. Operator is reduced from 46 to 38 in actual use. This reduction cause operator’s utilization to increase. Average operator utilization increases from 41% to 82,32%. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Dirgantara Indonesia (PT DI), a state-owned enterprises (BUMN) in Indonesia, mainly produces airplane and helicopter. NC-212i becomes the most favourite airplane in 2019. Based on latest data, PT DI is not yet accomplish their target within 2 months. It took 4 months for Final Assembly Line (FAL) Division to produce a unit of NC-212i. Based on analysis, low utilization of the operator is the root cause of this problem. This research aims to decide which model and assignment method of operator in assembly line that suitable to achieve production target and maximize operator’s utilization. Methods used in this research were analytical model and heuristic procedure. Analytical model is used to minimize total operator idle time considering the operator’s skill level. CPLEX Optimization Studio 12.9.0 is used to execute this model. Heuristic procedure is developed to accommodate data processing that can not be done using analytical model. Several steps describing mathematical equation used in analytical model construct this procedure. Solution resulted in this research are operator assignment and operation’s start time. Computation is done for every work station. Operator is reduced from 46 to 38 in actual use. This reduction cause operator’s utilization to increase. Average operator utilization increases from 41% to 82,32%.
format Final Project
author RADITA FARIZKI, ZEIN
spellingShingle RADITA FARIZKI, ZEIN
THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
author_facet RADITA FARIZKI, ZEIN
author_sort RADITA FARIZKI, ZEIN
title THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
title_short THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
title_full THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
title_fullStr THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
title_full_unstemmed THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
title_sort proposal of operator assignment method for final assembly line nc-212i pt dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/42095
_version_ 1822926170052624384