THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
PT Dirgantara Indonesia (PT DI), a state-owned enterprises (BUMN) in Indonesia, mainly produces airplane and helicopter. NC-212i becomes the most favourite airplane in 2019. Based on latest data, PT DI is not yet accomplish their target within 2 months. It took 4 months for Final Assembly Line (FAL)...
Saved in:
Main Author: | RADITA FARIZKI, ZEIN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/42095 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENGEMBANGAN ALGORITMA PEMBUATAN TASK ASSIGNMENT PADA FINAL ASSEMBLY LINE PESAWAT NC-212i PT DIRGANTARA INDONESIA
by: Daniel Lt, Victor -
PROPOSED MODEL AND HEURISTIC ALGORITHM FOR NC212i FINAL ASSEMBLY LINE WORKSTATION REQUIREMENT DETERMINATION PT DIRGANTARA INDONESIA
by: Ibrahim, Linggar -
IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
by: ABDUL GHANI NIM 13414111, HELMI -
RANCANGAN PENUGASAN OPERATOR PESAWAT NC-212I PADA STASIUN KERJA 1 DIVISI FINAL ASSEMBLY LINE PT DIRGANTARA INDONESIA
by: Carin Anastasya, Maria -
RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
by: Hamid, Fyrlia