PERANCANGAN DASHBOARD MONITORING DENGAN METODE EARNED VALUE MANAGEMENT DAN EARNED SCHEDULE UNTUK PROYEK PEMBANGUNAN GEDUNG PERKULIAHAN
PT XYZ is a construction company which currently handles college building construction project. Monitoring have been done using S-curve and at the time of research, project was delayed 9 weeks from baseline. The limitation of S-curve is not able to estimate cost and time of project completion. There...
Saved in:
Main Author: | FAUZANIAR, TRIANDINI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/42386 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
A DESIGN OF PROJECT MONITORING SYSTEM AND DASHBOARD BASED ON EARNED VALUE MANAGEMENT AND EARNED SCHEDULE METHOD.
by: Nurjanah, Siti -
THE APLICATION OF PROJECT PERFORMANCE MEASUREMENT AND MONITORING SYSTEM BY USING EARNED VALUE AND PERFORMANCE DASHBOARD CONCEPT
by: VESAL HAKIM (NIM: 29107138); Pembimbing: Ir. Rudy Bekti, MM, RADEN -
Monitoring Proyek Ducting FO Kawasan Tahap III Summarecon Bandung Menggunakan Metode Earned Value Management
by: Mualim, Puji Prabawa, et al.
Published: (2020) -
MONITORING AND EVALUATION OF THE VILLAS OF EMERALD DEVELOPMENT PROJECT USING THE EARNED VALUE AND EARNED SCHEDULE METHODS AND DESGNING THE INFORMATION SYSTEM
by: F S Simbolon, Dora -
PERENCANAAN PROYEK PEMBANGUNAN GEDUNG SENAYAN PARK (PERANCANGAN SISTEM DRAINASE)
by: Faqih Nashiruddin, Muhammad