A DESIGN OF PROJECT MONITORING SYSTEM AND DASHBOARD BASED ON EARNED VALUE MANAGEMENT AND EARNED SCHEDULE METHOD.
PT X is a pharmaceutical company in Indonesia which producing life science products. PT X currently working on a project called Renovasi Gedung Power House, with a total budget of Rp5.078.946.006,12 and planned to be completed in 87 weeks. To monitor all projects progress, PT X using S-curve. Based...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/69938 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |