TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI

Sangginora Minihydro Power Plant is located in Masampu river has a 113 km2 wide river basin. The purpose of Sangginora Power Plant is to increase the electrification ratio in Central Sulawesi. By analyzing daily rainfall from 2003-2018, the 100 years flood return period was 236,14 m3/s and the mains...

Full description

Saved in:
Bibliographic Details
Main Author: Boy Anggun Pribadi, Dhimas
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43129
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43129
spelling id-itb.:431292019-09-25T15:19:10ZTECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI Boy Anggun Pribadi, Dhimas Indonesia Final Project PLTM, flood discharge, reliable discharge, potential power, RAB INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43129 Sangginora Minihydro Power Plant is located in Masampu river has a 113 km2 wide river basin. The purpose of Sangginora Power Plant is to increase the electrification ratio in Central Sulawesi. By analyzing daily rainfall from 2003-2018, the 100 years flood return period was 236,14 m3/s and the mainstay discharge with a 50% reliability was 3,9 m3/s. The hydropower built with ogee-shaped weir, submerged bucket type and for another building consist of intake, sandtrap, headrace, forebay, penstock, and tail race. With the existing topographical conditions, an effective fall height of 92.43 meters was obtained. The amount of potential power that can be generated is 2.85 MW with 18.84 GWh annual energy potential and Rp. 25,480,795,141. per year as a potential income. The main building construction cost results a total of Rp 33,470,752,730.06 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Sangginora Minihydro Power Plant is located in Masampu river has a 113 km2 wide river basin. The purpose of Sangginora Power Plant is to increase the electrification ratio in Central Sulawesi. By analyzing daily rainfall from 2003-2018, the 100 years flood return period was 236,14 m3/s and the mainstay discharge with a 50% reliability was 3,9 m3/s. The hydropower built with ogee-shaped weir, submerged bucket type and for another building consist of intake, sandtrap, headrace, forebay, penstock, and tail race. With the existing topographical conditions, an effective fall height of 92.43 meters was obtained. The amount of potential power that can be generated is 2.85 MW with 18.84 GWh annual energy potential and Rp. 25,480,795,141. per year as a potential income. The main building construction cost results a total of Rp 33,470,752,730.06
format Final Project
author Boy Anggun Pribadi, Dhimas
spellingShingle Boy Anggun Pribadi, Dhimas
TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
author_facet Boy Anggun Pribadi, Dhimas
author_sort Boy Anggun Pribadi, Dhimas
title TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
title_short TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
title_full TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
title_fullStr TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
title_full_unstemmed TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
title_sort technical planning of sangginora minihydro power plant, in poso regency, central sulawesi
url https://digilib.itb.ac.id/gdl/view/43129
_version_ 1822926487446093824