TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
Sangginora Minihydro Power Plant is located in Masampu river has a 113 km2 wide river basin. The purpose of Sangginora Power Plant is to increase the electrification ratio in Central Sulawesi. By analyzing daily rainfall from 2003-2018, the 100 years flood return period was 236,14 m3/s and the mains...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43129 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:43129 |
---|---|
spelling |
id-itb.:431292019-09-25T15:19:10ZTECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI Boy Anggun Pribadi, Dhimas Indonesia Final Project PLTM, flood discharge, reliable discharge, potential power, RAB INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43129 Sangginora Minihydro Power Plant is located in Masampu river has a 113 km2 wide river basin. The purpose of Sangginora Power Plant is to increase the electrification ratio in Central Sulawesi. By analyzing daily rainfall from 2003-2018, the 100 years flood return period was 236,14 m3/s and the mainstay discharge with a 50% reliability was 3,9 m3/s. The hydropower built with ogee-shaped weir, submerged bucket type and for another building consist of intake, sandtrap, headrace, forebay, penstock, and tail race. With the existing topographical conditions, an effective fall height of 92.43 meters was obtained. The amount of potential power that can be generated is 2.85 MW with 18.84 GWh annual energy potential and Rp. 25,480,795,141. per year as a potential income. The main building construction cost results a total of Rp 33,470,752,730.06 text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Sangginora Minihydro Power Plant is located in Masampu river has a 113 km2 wide river basin. The purpose of Sangginora Power Plant is to increase the electrification ratio in Central Sulawesi. By analyzing daily rainfall from 2003-2018, the 100 years flood return period was 236,14 m3/s and the mainstay discharge with a 50% reliability was 3,9 m3/s. The hydropower built with ogee-shaped weir, submerged bucket type and for another building consist of intake, sandtrap, headrace, forebay, penstock, and tail race. With the existing topographical conditions, an effective fall height of 92.43 meters was obtained. The amount of potential power that can be generated is 2.85 MW with 18.84 GWh annual energy potential and Rp. 25,480,795,141. per year as a potential income. The main building construction cost results a total of Rp 33,470,752,730.06
|
format |
Final Project |
author |
Boy Anggun Pribadi, Dhimas |
spellingShingle |
Boy Anggun Pribadi, Dhimas TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI |
author_facet |
Boy Anggun Pribadi, Dhimas |
author_sort |
Boy Anggun Pribadi, Dhimas |
title |
TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI |
title_short |
TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI |
title_full |
TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI |
title_fullStr |
TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI |
title_full_unstemmed |
TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI |
title_sort |
technical planning of sangginora minihydro power plant, in poso regency, central sulawesi |
url |
https://digilib.itb.ac.id/gdl/view/43129 |
_version_ |
1822926487446093824 |