TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI

Sangginora Minihydro Power Plant is located in Masampu river has a 113 km2 wide river basin. The purpose of Sangginora Power Plant is to increase the electrification ratio in Central Sulawesi. By analyzing daily rainfall from 2003-2018, the 100 years flood return period was 236,14 m3/s and the mains...

Full description

Saved in:
Bibliographic Details
Main Author: Boy Anggun Pribadi, Dhimas
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43129
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia