TECHNICAL PLANNING OF SANGGINORA MINIHYDRO POWER PLANT, IN POSO REGENCY, CENTRAL SULAWESI
Sangginora Minihydro Power Plant is located in Masampu river has a 113 km2 wide river basin. The purpose of Sangginora Power Plant is to increase the electrification ratio in Central Sulawesi. By analyzing daily rainfall from 2003-2018, the 100 years flood return period was 236,14 m3/s and the mains...
Saved in:
Main Author: | Boy Anggun Pribadi, Dhimas |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43129 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LEIHITU MINIHYDRO POWER PLANT DESIGN IN CENTRAL MALUKU REGENCY
by: CAHYA MAULANA (15813029), CACA -
DESIGN PLANNING OF MINIHYDRO POWER PLANT IN BONE BOLANGO REGENCY, GORONTALO PROVINCE, INDONESIA
by: Chandra, Steven -
GEOTECHNICAL DESIGN PLANNING FOR MINIHYDRO POWER PLANT IN BONE BOLANGO
by: Bella Wibowo, Fabiola -
FOREBAY, PENSTOCK, POWER HOUSE, AND TAILRACE PLANNING IN CIROMPANG MINIHYDRO POWER PLANT, CIHIKEU, DISTRICT BUNGBULANG, GARUT REGENCY, WEST JAVA
by: ZAKIYAH (NIM : 15813028), ANNISA -
Forensic Study and Failure Analysis on Minihydro Power Plants (PLTM)
by: Maidani-13114020, Hendra