THE PROPOSED IMPROVEMENT OF CONSUMABLES MANAGEMENT ACTIVITY IN BANDUNG DENTAL CENTER CLINIC

increasing number of patients encourage the company to improve the quality of their service. One of them is to reduce the waiting time while preparing Consumable Part (BHP). Based on direct observation, the existing waiting time was obtained for three minutes which was considered quite long. Long...

Full description

Saved in:
Bibliographic Details
Main Author: Ashri, Nauvaliana
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43404
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items