PROPOSED MODEL AND HEURISTIC ALGORITHM FOR NC212i FINAL ASSEMBLY LINE WORKSTATION REQUIREMENT DETERMINATION PT DIRGANTARA INDONESIA
PT Dirgantara Indonesia (PTDI) is a state-owned aeronautics company. NC212i is one of the best products that PTDI produces. NC212i has a high number demand of 6 units a year. The existing condition and improvement plan that PTDI has for NC212i Final Assembly Line (FAL) can’t reach the needed desired...
Saved in:
Main Author: | Ibrahim, Linggar |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43434 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE PROPOSAL OF OPERATOR ASSIGNMENT METHOD FOR FINAL ASSEMBLY LINE NC-212i PT DIRGANTARA INDONESIA
by: RADITA FARIZKI, ZEIN -
IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
by: ABDUL GHANI NIM 13414111, HELMI -
PENGEMBANGAN ALGORITMA PEMBUATAN TASK ASSIGNMENT PADA FINAL ASSEMBLY LINE PESAWAT NC-212i PT DIRGANTARA INDONESIA
by: Daniel Lt, Victor -
RANCANGAN PENUGASAN OPERATOR PESAWAT NC-212I PADA STASIUN KERJA 1 DIVISI FINAL ASSEMBLY LINE PT DIRGANTARA INDONESIA
by: Carin Anastasya, Maria -
RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
by: Hamid, Fyrlia