WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA

In order to achieve company's vision, PT DI needs to take continuous improvement action to solve production sector problems which is the core business of the company. One of the problems that can be solved is the unfulfillment annual demand problem as happened in the MK-II fuselage component as...

Full description

Saved in:
Bibliographic Details
Main Author: Arya Amaviska, Adrian
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/43461
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:43461
spelling id-itb.:434612019-09-27T09:46:11ZWORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA Arya Amaviska, Adrian Indonesia Final Project assembly line, Mixed Integer Linear Programming, smoothness index INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/43461 In order to achieve company's vision, PT DI needs to take continuous improvement action to solve production sector problems which is the core business of the company. One of the problems that can be solved is the unfulfillment annual demand problem as happened in the MK-II fuselage component assembly line. To increase the production rate from 3 units per year to 4 units per year, the cycle time have to reduced from 512.59 hours to 400 hours. Therefore, it is necessary to analyze labor requirement of fuselage component that can meet annual demand. The model used in this study is Mixed Integer Linear Programming. This model output are workers assignment at work stations and tasks scheduling. The objective function is to minimize the number of workers. Inputs for this model are tasks data and tasks completion time, precedence constraints, jigs data, and number of workers needed to do each task. Computation is done using IBM ILOG CPLEX Optimization Studio version 12.7.1.0. Computation is performed on each jig due to large computation time. The solution successfully reduced assembly line cycle time from 512.59 hours to 328.50 hours, the number of workers from 49 people to 44 people, and the smoothness index from 1,071.84 to 545.20. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In order to achieve company's vision, PT DI needs to take continuous improvement action to solve production sector problems which is the core business of the company. One of the problems that can be solved is the unfulfillment annual demand problem as happened in the MK-II fuselage component assembly line. To increase the production rate from 3 units per year to 4 units per year, the cycle time have to reduced from 512.59 hours to 400 hours. Therefore, it is necessary to analyze labor requirement of fuselage component that can meet annual demand. The model used in this study is Mixed Integer Linear Programming. This model output are workers assignment at work stations and tasks scheduling. The objective function is to minimize the number of workers. Inputs for this model are tasks data and tasks completion time, precedence constraints, jigs data, and number of workers needed to do each task. Computation is done using IBM ILOG CPLEX Optimization Studio version 12.7.1.0. Computation is performed on each jig due to large computation time. The solution successfully reduced assembly line cycle time from 512.59 hours to 328.50 hours, the number of workers from 49 people to 44 people, and the smoothness index from 1,071.84 to 545.20.
format Final Project
author Arya Amaviska, Adrian
spellingShingle Arya Amaviska, Adrian
WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA
author_facet Arya Amaviska, Adrian
author_sort Arya Amaviska, Adrian
title WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA
title_short WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA
title_full WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA
title_fullStr WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA
title_full_unstemmed WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA
title_sort workforce requirements analysis of fuselage helicopter mk-ii component in pt dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/43461
_version_ 1822926584659574784