WORKFORCE REQUIREMENTS ANALYSIS OF FUSELAGE HELICOPTER MK-II COMPONENT IN PT DIRGANTARA INDONESIA
In order to achieve company's vision, PT DI needs to take continuous improvement action to solve production sector problems which is the core business of the company. One of the problems that can be solved is the unfulfillment annual demand problem as happened in the MK-II fuselage component as...
Saved in:
Main Author: | Arya Amaviska, Adrian |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43461 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF MK-II HELICOPTER TAILBOOM OPERATOR NEEDS WITH MULTI-OPERATOR LINE ASSEMBLY OPTIMIZATION METHOD IN PT DIRGANTARA INDONESIA
by: MAUDY SARI, FARADITA -
WORKER REQUIREMENT ANALYSIS OF CENTER FUSELAGE PANELIZATION SYSTEM IN CN-235 AIRCRAFT PT DIRGANTARA INDONESIA
by: AYU KUSUMA WARDANI, LINDA -
QUALITY CONTROL OF LATHE PROCESS IN MK-II PROGRAM PT DIRGANTARA INDONESIA
by: NARULITA, RACHMANIA -
IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
by: ABDUL GHANI NIM 13414111, HELMI -
Experimental and numerical investigations on the aerodynamics of a simplified helicopter fuselage
by: Cheawchan, Atcha-uea
Published: (2022)