SOIL IMPROVEMENT DESIGN FOR HARBOUR STOCKYARD PT. KRAKATAU STEEL USING GROUT MODULAR COLUMN (KGM)
The soil improvement design carried out in this final project is a part of soil improvement project for the harbour stockyard owned by PT. Krakatau Steel. The type of soil improvement for this project is soil reinforcement with grout modular column. Soil improvement in this area is intended to preve...
Saved in:
Main Author: | Bagja Kusumah Sukarno, Rayina |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/43572 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF SOIL IMPROVEMENT WITH STONE COLUMN METHOD FOR STOCKYARD AND EMPLACEMENT IN GARONGKONG TRAIN STATION
by: Jabarudin Nur, Rizal -
GROUTED SLEEVE CONNECTIONS FOR STEEL MODULAR BUILDINGS
by: DAI ZIQUAN
Published: (2020) -
DESIGN OF SOIL IMPROVEMENT WITH DEEP SOIL MIXING FOR EMPLACEMENT AND STOCKYARD IN GARONGKONG TRAIN STATION
by: Baihaqi Pasaribu, Irsyad -
NOVEL GROUTED SLEEVE CONNECTION FOR REINFORCED CONCRETE COLUMNS IN MODULAR BUILDINGS
by: CHEONG TIEN YANG CLARENCE
Published: (2021) -
Improving soft peaty soil by grouted stone columns Punggol waterway project, Singapore
by: Chew, S.H., et al.
Published: (2014)